Army Corps of Engineers

A Proactive Approach to Construction Safety

Does your company take a reactive or proactive approach to construction safety? Most companies' safety programs combine the two methods, being proactive in some ways but reactive in other aspects.

Here are some best practices to implement in your safety program to take a proactive approach to safety:

1. Empower everyone on the job site, regardless of position, with the authority to issue a stop-work for any perceived safety concerns. Only allow work to resume once the issue has been adequately addressed.

2. Create a safety plan specific to the project and site. Do this in conjunction with the creation of the construction plan. As you plan how to build and deliver the project, plan how to keep your workers safe as construction progresses through each task and phase.

3. Monitor, evaluate, and adjust. As work progresses, conditions can change drastically from one day to another. Understanding how changing conditions can create new safety hazards is essential. Continuous improvements to safety measures need to be made based on the most up-to-date information on job site conditions.

4. Training should be an ongoing activity for all employees. Train workers on the safe and proper way to operate equipment and select and use personal protective equipment (PPE). Remember, workers don't have to be in an accident to suffer an injury. Be sure to train workers on proper techniques to perform tasks that create the least stress on their bodies.

5. Create a safety committee to review safety performance on all projects. Ensure that employees from all levels of the business are involved, especially craft laborers. They have first-hand experience with how safety measures are being implemented on the site and can provide vital feedback on areas of concern that must be addressed. They should have a voice in helping choose which safety measures to implement to control and mitigate hazards.

6. Fully vet all subcontractors on their safety records and ask them to review their written safety program. Once selected, work with subcontractors to help develop the safety plan, as they can provide valuable insight specific to their trade. Ensure subcontractor agreements cover adhering to your site safety plan so you can hold them accountable.

7. Hold safety meetings each day or before each shift to cover specific tasks, safety measures and protocols, and any areas of concern. Be sure to discuss existing and any new hazards that may arise throughout the day and how to avoid them.

8. Go beyond a compliance-driven approach to safety. Work to identify additional safety measures and precautions you can take to protect your workers better and prevent accidents.

9. Investigate all accidents and near misses to identify the root causes. Focus less on who was responsible and more on how and why the accidents or near misses occurred. Understanding the root cause can better develop solutions to prevent accidents from happening again and better protect your workers.

10. Incentive programs should encourage workers to adopt a proactive approach to construction safety. They should encourage workers to speak up and report unsafe conditions or work behavior. They should promote safe working practices rather than encouraging workers not to report incidents.

11. Conduct routine safety audits. The safety manager can either do these internally or hire an outside third party to review your safety program and practices.

Invest in improving your safety program, such as investing in new equipment or tools to improve your business. Taking a proactive approach to safety can lead to improved productivity and increase the quality of work. Companies with solid safety records tend to have better employee morale and a positive reputation in their field.

For nearly a decade, Greenup Industries has provided a full-range of specialty construction services to our diverse client base. By stressing the importance of integrity, respect, collaboration, trust, and delivery we have built a great team ready to serve you.

For more information, please visit https://bit.ly/3q3uDYn


Myrtle Grove construction Project Update

Greenup is working on the Hurricane Protection Project in Plaquemines Parish, LA, to keep people safe. We are pleased to provide you with this Myrtle Grove update:

In spite of the weather, we have continued to press ahead on this critical risk-reduction project for the people of Plaquemines Parish. So far, we have placed over 1.1 million Cubic Yards (CY) for levee construction, supporting geotextile fabric for levee stability, ninety-five percent of the

levee footprint has been cleared and is ready for continued construction, over 16,000 square feet of steel sheet piles have been driven for the utility crossings and drainage structure, over 15 structural pipe piles have been driven to support those structures, 5000 linear feet (LF) of

culverts for site drainage, nearly 300,000 CY has been excavated for the new drainage canal. In addition, two thousand tons of stone have been placed in that canal to retard erosion. This project is still scheduled

to finish on time in August 2026.

Greenup is partnering with Cajun JV, LLC, and presented the lowest bid for the New Orleans to Venice [first] lift levee and drainage canal relocation project, La Reussite to Myrtle Grove, Plaquemines Parish. The project consists of clearing, grubbing, excavating new drainage canals, placing culverts and drainage structures, building new T-walls and levee ramp crossings, placing levee embankments, geotextile work, turf establishment, and surfacing. “We are thrilled to be working with Cajun Industries on this project and look forward to doing all we can to provide storm and hurricane protection to Louisiana,” Rodney Greenup says.

Greenup Industries is adept at handling large-scale projects for the public good. From refurbished roads and bridges to industrial construction and maintenance, Louisiana-based Greenup Industries is behind countless projects across the Gulf South that point to the region’s growth and vibrancy.

A full-service construction general contractor providing civil and

commercial construction work and construction management throughout the Gulf Region, Greenup has clocked over 500,000 safe work man-hours and is the recipient of several awards for safety. These awards include the Gold Medal Award, presented by Shell/Norco; the Contractor Safety Award, presented by CAST, and the Safety Excellence Award, presented by Gulf South Safety Council.

For more information about Greenup Industries, please visit us at https://greenupind.com.

GREENUP'S construction WORK WITH THE ARMY CORPS OF ENGINEERS

Greenup Industries offers contracting and specialized construction services for industrial, commercial, and municipal clients. From refurbished roads and bridges to industrial construction and maintenance, the company is behind countless projects. Recent projects included the Army Corps of Engineers New Orleans to Venice 1st lift levee and drainage canal relocation project, La Reusitte to Myrtle Grove, Plaquemines Parish project.

West Shore Lake Pontchartrain Project

The West Shore Lake Pontchartrain Hurricane Protection project is an 18.5-mile system that includes 17.5 miles of levees, one mile of T-wall, drainage structures, pump stations, and several non-structural protection measures to form an integrated protection system.

The West Shore Pontchartrain Project alongside the US Army Corps of Engineers, New Orleans District. consists of clearing, grubbing, excavating new drainage canals, placing culverts and drainage structures, building new T-walls and levee ramp crossings, placing levee embankments, geotextile work, turf establishment, and surfacing.

Myrtle Grove Project

US Army Corps of Engineers, Vicksburg District, has awarded Greenup Cajun JV, LLC a $102.5 million dollar construction contract to build hurricane protection structures and move levees and drainage canals in Louisiana’s Plaquemines Parish. 

Greenup Cajun JV, LLC, presented the lowest bid of four for the “New Orleans to Venice 1st lift levee and drainage canal relocation project, La Reussite to Myrtle Grove, Plaquemines Parish.” The project will consist of clearing, grubbing, excavating new drainage canals, placing culverts and drainage structures, building new T-walls and levee ramp crossings, placing levee embankments, geotextile work, turf establishment, and surfacing. The estimated cost of the project is $102,452,461.00.

Greenup Industries is a full-service construction general contractor that provides civil and commercial construction work and construction management for projects in the state of Louisiana. For more information about Greenup Industries, please visit https://bit.ly/3q3uDYn

 

MYRTLE GROOVE LEVEE construction PROJECT update

The U.S. Army Corps of Engineers is continuing to make progress with the New Orleans to Venice (NOV) Hurricane Protection project in Plaquemines Parish, La. The purpose of the NOV project is to provide an improved levee system for storm risk reduction for Plaquemines Parish by repairing and restoring the original project levees, accelerating the completion of unconstructed portions of the authorized project, and armoring critical elements of the authorized project. The NOV federal levees are located on the east bank of Plaquemines from Phoenix to Bohemia and on the west bank from St. Jude to Venice.

Currently, along the La Reussite to Myrtle Grove levee reach, USACE is constructing approximately seven miles of new drainage canals and levees. USACE workers and their construction partners are placing embankment material at the site of the levee construction, slowly building up layers of soil and material for the levee. So far, 85% of the canal have been completed and approximately 50% of the levee has been built along this particular levee reach. This portion of the project is scheduled to be completed by calendar year 2026.

UPDATE ON GREENUP INDUSTRIES' construction PROJECT WITH USACE AT MYRTLE GROVE

The U.S. Army Corps of Engineers is continuing to make progress with the New Orleans to Venice (NOV) Hurricane Protection project in Plaquemines Parish, La. The purpose of the NOV project is to provide an improved levee system for storm risk reduction for Plaquemines Parish by repairing and restoring the original project levees, accelerating the completion of unconstructed portions of the authorized project, and armoring critical elements of the authorized project.

The NOV federal levees are located on the east bank of Plaquemines from Phoenix to Bohemia and on the west bank from St. Jude to Venice. Currently, along the La Reussite to Myrtle Grove levee reach, USACE is constructing approximately seven miles of new drainage canals and levees. USACE workers and their construction partners are placing embankment material at the site of the levee construction, slowly building up layers of soil and material for the levee. So far, 85% of the canal have been completed and approximately 50% of the levee has been built along this particular levee reach. This portion of the project is scheduled to be completed by calendar year 2026.

GREENUP INDUSTRIES

US Army Corps of Engineers, Vicksburg District, awarded Greenup Cajun JV, LLC a $102.5 million dollar construction contract to build hurricane protection structures and move levees and drainage canals in Louisiana’s Plaquemines Parish. 

Greenup Cajun JV, LLC, presented the lowest bid of four for the “New Orleans to Venice 1st lift levee and drainage canal relocation project, La Reussite to Myrtle Grove, Plaquemines Parish.” The project will consist of clearing, grubbing, excavating new drainage canals, placing culverts and drainage structures, building new T-walls and levee ramp crossings, placing levee embankments, geotextile work, turf establishment, and surfacing. The estimated cost of the project is $102,452,461.00.

Greenup Industries Continues to Excel in USACE Myrtle Grove Levee and Drainage Canal and Hurricane Protection Project

Greenup Industries partnered with Cajun Industries, LLC on a construction contract to build hurricane protection structures and move levees and drainage canals in the New Orleans area. Greenup presented the lowest bid of four for the "New Orleans to Venice 1st lift levee and drainage canal relocation project, La Reussite to Myrtle Grove, Plaquemines Parish". The project consists of clearing, grubbing, excavating new drainage canals, placing culverts and drainage structures, building new T-walls and levee ramp crossings, placing levee embankments, geotextile work, turf establishment, and surfacing. The estimated cost of the project recently increased 6% from $ 102,452,461.00 to $108,783,413. The project has an expected completion date of Summer, 2026.

Continuing to excel in terms of production and quality, Greenup has been making great progress in several areas. Those include clearing the levee footprint, reaching completion of 81 percent of the entire project, excavating another 1500 cubic yards (cy) of drainage canal and a total of 12,500 linear feet (LF) of 48" culvert pipes have been installed to facilitate proper drainage of rainwater. This project continues to progress ahead of schedule with a completion date currently in the Summer of 2026. "This project continues to progress ahead of schedule with a completion date currently in the Summer of 2026. Several change orders are being finalized, which will have little effect on the schedule but will provide a much better level of risk reduction for the people of Plaquemines Parish," says Rodney Greenup, President of Greenup Industries.

Greenup Industries provides a full range of onboarding solutions, maintenance and design services, and specialty construction services to our diverse set of clients. "We offer effective onboarding, reduced costs, accountability, and consistent vetting of vendors," Greenup said. Greenup Industries has clocked over 500,000 safe work man-hours and is the recipient of several awards for safety, including the Gold Medal Award, presented by Shell/Norco, the Contractor Safety Award, presented by CAST, and the Safety Excellence Award, presented by Gulf South Safety Council.

About Rodney Greenup
Rodney Greenup, a New Orleans native, began his career as a mechanical engineer and project manager with the U.S. Army Corps of Engineers. With over 25 years of experience in providing project management and technical solutions to large-scale construction and maintenance projects. Greenup Industries, a trusted solutions provider, is also the recipient of several awards, including the Gold Medal Award presented by Shell/Norco, the Contractor Safety Award, presented by CAST, Supplier of the presented by Tier III, Emerging Growth Company Award, presented by ACG and many more.

About Greenup Industries
Greenup Industries provides a full range of onboarding solutions, maintenance, and staffing services, as well as specialty construction services to its diverse client base. Greenup strives to continually improve its performance and provide added value. To learn more about Rodney Greenup and Greenup Industries, please call (225) 283-4843 or visit https://greenupind.com/

Rodney Greenup
Greenup Industries 
+1 504-598-3677
info@greenupind.com
Visit us on social media:
Facebook
Twitter
LinkedIn
Instagram
YouTube

Video - Greenup Industries - Our Relationships Fuel Our Success

Contact

Rodney Greenup
Greenup Industries
+1 504-598-3677info@greenupind.com

 

February construction Project Updates

Stockpile 1 - Progress has been severely impacted by rain every few days.  When weather permits, we are working our haul roads in the Spillway and the stockpile location in LaPlace.  We are also continuing to excavate material allowing it to begin the drying process, because the material that is excavated is very wet.  As a result of the weather, we are currently scheduled to complete this project in the early fall of 2023.

Myrtle Grove - This project continues to progress quickly and is ahead of schedule.  So far we have placed 74,000 square yards of separator fabric under access roads, 55,000 Cubic Yards of sand for those access roads and preload location, excavated over 230,000 cubic yards of material for the drainage canal, placed 76,000 square yards of Levee Support Geotextile, and built 170,000 cubic yards of clay levee.

This project is scheduled to be completed in the summer of 2025 but we anticipate a change request from the Corps of Engineers that will significantly extend the execution period.  

About Greenup Industries

Based in Kenner, Greenup Industries offers contracting and specialized construction services for industrial, commercial, and municipal clients. The company's proprietary software, the Greenup Tracker, can connect third-party vendors with facilities that need painters, plumbers, groundskeepers, carpenters, etc.

If you would like more information on this project, please contact Greenup Industries at 225.283.4843 or info@greenupind.com.

Rodney Greenup

Greenup Industries 

+1 225-383-4843